3266
Bruce Dodds
04/15/2020
Closed
I believe the City had a drainage project within the past 4 or 5? years along the east side of East Lake Sammamish Parkway just north of SE 32nd street adjacent to the Waverly Hills 2 plat. The project consists of a 24 inch pipe that runs north and drains runoff from the Parkway, SE 24th Way, and lands above. I would like to see a digital copy of the TIR (Technical Information Report) for that project. Thanks
4/20/2020- Hightailed responsive documents. AK
Government