3128
Victor Salemann
01/16/2020
Closed
I’m interested in the trip generation assumed for the work/live units and the alignment of the proposed SE Connector and how the developer contribution was calculated. Is there a traffic study that covers these items?
1/16/2020- Emailed document. AK
Government