Neighborhood Traffic Management Projects

NE 19th Dr (228th Ave NE to 236th Ave NE)

NE 19th Dr Project Map
NE 19th Dr Project Limit Map
Image | PDF

Summary:

The City of Sammamish is working with neighborhood residents to install traffic
management measures on NE 19th Dr as part of the City’s Neighborhood Traffic Management Program projects in 2010. The proposed traffic/pedestrian safety improvements on NE 19th Dr include the installation of sidewalk curb extensions, a traffic circle at the intersection of NE 19th Dr and 231st Pl NE, raised crosswalk at trail crossing, and additional pavement markings and signage.  This project will also repave NE 19th Dr from 228th to 236th. 

Neighborhood Meeting: A neighborhood meeting was held on May 3, 2010 to share project information and gather input for improvements along this stretch of road.
Date/Location: Monday, May 3, 2010 6:00 - 7:00 PM
Samantha Smith Elementary School Library
23305 NE 14th St, Sammamish WA 98074
Ballot for Project Construction: 6/1/2010 - 6/15/2010.  Completed on 6/14/10.
Design: Completed.  Advertised for Bids on 7/22/10.  Bids opened on 8/5/10 
Construction Schedule: Construction completed October 2010.

NE 14th Dr (220th Pl NE to 228th Ave NE)

NE 14th Dr Project Map
NE 14th Dr Project Limit Map
Image | PDF

Summary:

The City of Sammamish is working with neighborhood residents to install traffic
management measures along NE 16th St/ NE 14th Dr/ NE 12th Pl corridor (from 220th Pl NE to 228th Ave NE) as part of the City’s Neighborhood Traffic Management Program projects in 2010.  The proposed traffic/pedestrian safety improvements include the installation of sidewalk curb extensions, a traffic circle at the intersection of NE 16th St/220th Pl NE, and additional pavement markings and signage.  

Neighborhood Meeting: A neighborhood meeting was held on May 4, 2010 to share project information and gather input for improvements along this stretch of road.
Date/Location: Tuesday, May 4, 2010  6:00 - 7:00 PM
Margaret Mead Elementary School Library
1725 216th Ave NE, Sammamish WA 98074
Ballot for Project Construction: Completed on June 24, 2010
Design: August-September 2010.
Construction Schedule: Pavement marking to be completed by October 2010.
Construction completed April 2011.

NE 25th Way, 228th Ave NE to 239th Pl NE

NE 25th Way, 228th Ave NE to 239th Pl NE Project Map

Image | PDF


Summary:

 

Neighborhood Meeting:  A neighborhood meeting was held on April 23, 2013 to share project information and gather input for improvements along this stretch of road.
Date/Location: Tuesday, April 23, 2013 6:30 - 7:30 PM
Samantha Smith Elementary School Library
23305 NE 14th St, Sammamish WA 98074
Ballot for Project Construction: 6/1/2010 - 6/15/2010.  Completed on 6/14/10.
Design: In progress 
Construction Schedule: Construction planned for early Spring 2014

Resources

Staff Contact